Quantcast
Channel: Building a 34 ft Lyle Hess Falmouth Cutter
Viewing all articles
Browse latest Browse all 63

Details

$
0
0
A lot of small jobs to do after getting the rig up. Here are a few...


Adding silicon bronze armour to the bowsprit to protect from the chain.




 Mast wiring and fitting the cabin sole boards around the mast.


The Plath windlass needs a chain stripper. Fabricated out of 1/4" bronze plate.


Chain stripper installed. Has a lanyard hole for the chain hawse cover.


For some reason the Plath windlass handle was not only very short but also painted steel, not even galvanized. Here is a new stainless steel one.



A piece of the vast amount of rigging detail work.



The inner neoprene mast boot. 


Outer mast boot





Viewing all articles
Browse latest Browse all 63

Trending Articles